After months in obscurity, the Perry water tower shines forth Saturday evening in summer light. The Perry Water Works paid $116,000 to have the lead-based paint removed from the surface of the 500,000-gallon structure.


After months in obscurity, the Perry water tower shines forth Saturday evening in summer light. The Perry Water Works paid $116,000 to have the lead-based paint removed from the surface of the 500,000-gallon structure.